![pipeline crossing airbridge pipeline crossing airbridge](https://mechanized.lincolnelectric.com/wp-content/uploads/2020/01/Untitled-3.jpg)
White & Case served as legal advisor for Texas LNG in connection with the deal, while Vinson & Elkins represented Enbridge. “We welcome the opportunity to expand our pipeline solutions in support of LNG efforts.” The motors use Texas renewable energy to minimise CO2 emissions.Įnbridge gas transmission and midstream president and executive vice president Bill Yardley said: “Enbridge is committed to the development and advancement of the Valley Crossing Pipeline as it serves Texas LNG and helps the facility meet global LNG demand. The scope of works involved the replacement of the existing pipe crossing between Kilpatrick TRS and the Erskine Bridge Block Valve. VCP’s pipeline header at Agua Dulce is said to be interconnected with ten major gas pipeline systems to provide enhanced access to gas from the Permian and other major gas basins with a total receipt capacity of more than seven billion cubic feet per day.Įlectric motors will be used by the compression facilities at Agua Dulce. Murphy was appointed as Principal Contractor on the Erskine Bridge Pipeline Replacement project for SGN. “We are pleased that we can leverage Enbridge’s leading natural gas pipeline expertise to safely transport responsible natural gas to our ‘green by design’ LNG facility.” Texas LNG founder and CEO Vivek Chandra said: “Enbridge has been a tremendous supporter of Texas LNG from the project’s inception. They are our first call.Texas LNG is developing a LNG export terminal, with a capacity of four million tonnes per annum (MTPA), in the Port of Brownsville, South Texas. Our Chain of Custody certification aligns with your sustainable procurement policies. Back to Product Blog Previous Post Next Post. comes complete with 2 abutments and 2 bridges sections. If NEW SOUTH can’t do it and do it quickly, the job can’t be done. This particular crossing is rated for all H-20 Highway Loading, 12 Cu Yard Dump Trucks, up to D-7 Cat and 561 Pipe Layer. From design phase to installation, whenever we called them with questions, NEW SOUTH was responsive and absolutely helpful – even when we called to ask them to clean up our former supplier’s mess. The lightweight and modular system provides a cost-effective solution through optimised design methods, an. Balmoral’s crossing protection system is designed to provide protection and separation between new cables or pipelines and existing cables in a subsea environment. The diagrams really impressed our customer, as did the materials used – the bridges looked great from start to finish. Crossing / crossover solution for protecting subsea cables and pipelines. “NEW SOUTH’s on-site assessment was excellent, as were the engineering data and services. Turns out, the problem was well worth solving. In solving the problem, the NEW SOUTH team (consisting of Earthsafe & emtek engineers) designed a solution to match the specified ground pressure requirements for each piling and pipeline crossed. Strict downpressure requirements eliminated traditional hardwood mats as an option and made safety certification of this access road mandatory. This paper provides an overview of the pipeline shore crossing method selection and design processes. Latchco called NEW SOUTH for help, beginning with an access design consultation. The real catch? The space was lined with side-by-side, highly sensitive pipelines. An assessment of SPS mobile pipeline system suitability for crossings was carried out by Wood Group Kenny. Using the Python Docker SDK, Airbridge efficiently encapsulates components and dependencies within containers, enabling consistent configuration-driven deployment across different environments. Atteris has been the author of an Engineering Guideline for Shoreline and Waterway Crossings, with elements of it feeding in to national and international standards, such as AS 2885.4 and DNV-ST-F101. Built on standards-based Python, Airbridge ensures a clean, quick, and modular data flow, allowing easy integration and modification. NEW SOUTH customer Latchco Construction had a problem: They needed to be able to drive 200,000-pound wheeled axle loads across 600 feet of marsh-and-swamp right-of-way near the Gulf of Mexico for a drilling rig installation. Atteris has delivered pipeline and cable shore crossing designs based on open cut and cover, horizontal directional drilling, and tunnelling techniques.